Installation Guide
Before You Start
- Verify bearing dimensions match housing bore and shaft
- Clean housing bore thoroughly
- Ensure shaft surface is smooth
Step 1: Press Fitting
Apply even pressure to shell outer diameter ONLY. Never press on rubber lining.
Step 2: Secure Bearing
Install set screws or retaining pins. Do not overtighten.
Step 3: Check Clearance
Insert shaft, measure clearance with feeler gauge. Shaft should turn freely with slight resistance.
Step 4: Water Supply Check
Verify water flow path unobstructed. Minimum 0.5 L/min per 100mm shaft diameter.
Step 5: Initial Run-In
Start at low RPM. Gradually increase to operating speed over 2-4 hours. Monitor temperature, should stabilize below 60C.